Avoid expensive 4CP charges with smart curtailment.

Get early warnings for ERCOT peak events and automatically reduce demand during the four highest system peaks.

The Problem

4CP charges are unpredictable

The four highest system peaks happen without warning, typically during hot summer afternoons. Miss one event and pay elevated transmission costs for the entire following year.

Manual monitoring fails

Watching ERCOT data manually means reacting too late. By the time you see high system load, the 15-minute interval is already locked in at peak demand.

Transmission costs keep rising

4CP rates increased 15% in 2024. For large facilities, transmission can represent 30-40% of total electricity costs - all based on just four 15-minute periods.

What You Get

4CP Event Predictions

Get probabilistic alerts when ERCOT system load approaches peak levels. Typically 15-30 minutes advance warning to execute curtailment strategies.

Automated Curtailment

Webhook alerts integrate with building management systems. Automatically reduce non-critical loads when events are likely.

Savings Calculator

Track actual load reduction during events and calculate transmission cost savings based on current 4CP rates.

Custom Strategies

Build curtailment plans specific to your facility type - manufacturing, data centers, offices, or retail operations.

Smart Curtailment in Action

Manufacturing Facility

Alert: "4CP probability > 80% at 16:45"
Action: "Pause non-critical production lines"
Load: "8.2 MW → 5.8 MW (30% reduction)"

Temporarily reduce lighting, HVAC setpoints, and pause non-time-sensitive manufacturing processes. Typical savings: $50-150K annually on transmission costs.

Data Center Operations

Alert: "System peak likely in 20 minutes"
Action: "Activate demand response mode"
Strategy: "UPS discharge + cooling optimization"

Use UPS battery power, increase cooling setpoints temporarily, and migrate workloads. Maintain uptime while reducing grid demand by 15-25%.

Office Buildings

Alert: "Peak event probability 85%"
Action: "Pre-cool + reduce non-essential loads"
Impact: "Minimal occupant disruption"

Pre-cool spaces, reduce elevator usage, dim lighting in common areas. Smart scheduling maintains comfort while cutting peak demand.

Real Facility Examples

Manufacturing Plant

Peak Load:8.2 MW
Curtailment Target:30% reduction
4CP Rate:$24.50/kW-year
Without curtailment:$200,900/year
With smart alerts:$58,800 saved

Data Center

Peak Load:25 MW
Curtailment Strategy:UPS + cooling
Load Reduction:20% (5 MW)
4CP exposure:$612K/year
Annual savings:$122K saved

Technical Advantages

85%
Prediction accuracy

Reliable alerts reduce false positives and missed events

20min
Average lead time

Enough time to execute curtailment without disruption

4/4
Events detected (2024)

Perfect track record for actual 4CP events

Simple Integration API

# Get 4CP probability alerts
curl https://api.wattmarkets.com/v1/4cp/probability   -H "Authorization: Bearer YOUR_API_KEY"

# Response
{
  "timestamp": "2024-07-15T16:25:00Z",
  "probability": 0.85,
  "system_load": 74200,
  "forecast_peak": 76450,
  "recommendation": "curtail_now",
  "lead_time_minutes": 20
}

Stop paying excessive transmission costs

Get early warnings for 4CP events and implement smart curtailment strategies that reduce your transmission bill.